Skip Navigation

Municipal Class Environmental Assessment Studies

Breadcrumbs

2012 Wastewater Pumping Station Master Plan

Status:

Completed

Consultant:

R.V. Anderson Associates Limited

Regional Contact:

accesshalton@halton.ca

Details

Purpose:

The 2012 Wastewater Pumping Station Master Plan was undertaken to prepare a comprehensive plan for asset renewal which considered future needs and infrastructure optimization for 59 wastewater pumping stations in south Oakville and south Burlington.

Scope:

This study was carried out in accordance with the Municipal Class Environmental Assessment process for a Master Plan. The study includes:

  • Identification of alternative servicing concepts.
  • Preparation of an environmental inventory of the study area, including natural, heritage and social characteristics.
  • Evaluation of alternative servicing concepts.
  • Selection of a preferred pumping station management strategy.
  • Development of the implementation strategy to execute the master plan.
  • Public and review agency consultation.
  • Preparation of the Project File for review and approval.

If you require the following documents in an alternate format, please call 311, TTY: 905 827-9833 or e-mail accesshalton@halton.ca.

TOP