2012 Wastewater Pumping Station Master Plan
Purpose:
The 2012 Wastewater Pumping Station Master Plan was undertaken to prepare a comprehensive plan for asset renewal which considered future needs and infrastructure optimization for 59 wastewater pumping stations in south Oakville and south Burlington.
Scope:
This study was carried out in accordance with the Municipal Class Environmental Assessment process for a Master Plan. The study includes:
- Identification of alternative servicing concepts.
- Preparation of an environmental inventory of the study area, including natural, heritage and social characteristics.
- Evaluation of alternative servicing concepts.
- Selection of a preferred pumping station management strategy.
- Development of the implementation strategy to execute the master plan.
- Public and review agency consultation.
- Preparation of the Project File for review and approval.