West River Wastewater Pumping Station Class EA Study
Purpose:
To consider a wide range of wastewater pumping station (WWPS) and collection system upgrades in order to service growth in the Town of Oakville to 2031.
Scope:
This Class EA study will include:
- Review options to upgrade the WWPS and collection system to service growth
- Evaluation of alternative solutions
- Assessment of the impacts and identification of mitigation measures
- Public and review agency consultation
- Prepare the Project File for review and approval
If you require the following documents in an alternate format, please call 311, TTY: 905 827-9833 or e-mail accesshalton@halton.ca.